Deliverable 6.6: HYPERGRYD Workshops Series Deliverable D6.6 describes: i) the proposed workshops for stakeholders which will be held throughout the project, and ii) February 4, 2025
D5.2 Digital Twins of components and Living Labs development, preliminary version This deliverable highlights the successful integration of the BIM-GIS toolkit into the HYPERGRYD platform for DHC network piping September 25, 2024
D4.4 Smart energy services and operation tools Smart energy services and operation tools. September 25, 2024
D3.7 Description and report of developed multi-physics SAInt modelling tool for network coupling and optimisation. Preliminary version Description and report of developed multi-physics SAInt modelling tool for network coupling and optimization. Preliminary version. September 25, 2024
D3.5 Description and report of energy exchange and smart trading tool including simulation studies for living labs as active LECs. Preliminary version GSY, in collaboration with project partners, has enhanced the Grid Singularity Exchange software (Energy exchange and smart trading September 25, 2024
D2.8 Integration of the models and optimal controls into the components and the enabling of flexibility services This deliverable seeks to validate a data-driven model predictive control system designed to optimize heating services economically by September 25, 2024
D2.7 Technical specifications and guidelines for Enabling Technologies integrations in Smart Energy Grids Technical specifications and guidelines for Enabling Technologies integrations in Smart Energy Grids. September 23, 2024
D4.2 ICT Architecture and data requirements for HYPERGRYD DT PaaS The primary objectives of this deliverable can be summarised as follows: 1. Establishing the comprehensive ICT architecture for September 23, 2024
D4.1 HYPERGRYD Use Case definition including stakeholders and Roles for DT PaaS Deliverable corresponds to T4.1: Live-in Labs auditing and definition of Use cases, Stakeholders & Roles. The objective of March 19, 2024